Avignon Tramway Project: Infrastructure, Trends & Future
Avignon’s €380 million tramway project, featuring two lines and 27 stations, is set to revolutionize urban mobility by 2029.

Introduction
In 2022, the Grand Avignon Urban Community approved a budget of €380 million for the Avignon tramway project. This project, which is expected to improve urban mobility, involves a network of two tram lines, with a total length of 14.7 km, and is scheduled to be operational by 2029.
Project Overview
The Avignon tramway project, initiated by the Grand Avignon Urban Community, encompasses the construction of two tram lines. Line A will run from Saint-Roch to Le Pontet, spanning 9.8 km, while Line B will connect Saint-Chamand to Agroparc, covering a distance of 4.9 km. The project includes 27 stations and is designed to enhance the city’s public transport infrastructure.
Financial Aspects
The total budget allocated for the Avignon tramway project is €380 million. This financial commitment underscores the scale of the undertaking and the commitment of the Grand Avignon Urban Community to the project. The budget covers all aspects of the project, including infrastructure development, rolling stock procurement, and operational readiness.
Timeline and Implementation
The construction of the tramway network is planned to be completed and operational by 2029. This timeline reflects the complexity of the project, which involves extensive civil engineering works, the installation of railway systems, and the integration of the new tram lines within the existing urban environment. The project will be carried out in phases to minimize disruption and ensure the efficient use of resources.
You might be interested in: “`html
“`
Project Scope
The project scope includes two lines, Line A and Line B, with a combined length of 14.7 km. The network will feature 27 stations, strategically positioned to provide comprehensive coverage across the city. This design is aimed at improving accessibility and promoting the use of public transport for both residents and visitors.
Conclusion
The Grand Avignon Urban Community has approved a €380 million budget for the construction of a tramway network, comprising two lines totaling 14.7 km in length. Scheduled for completion by 2029, the project will include 27 stations.
Company Summary
Grand Avignon Urban Community: The Grand Avignon Urban Community is responsible for initiating and managing the Avignon tramway project. The community approved a budget of €380 million for the project.
