Fornebu Line: Oslo Metro – 2026 Construction Update

Oslo’s Fornebu Line, a major railway expansion, opens, connecting Majorstuen to Fornebu, boosting jobs and easing congestion.

Fornebu Line: Oslo Metro – 2026 Construction Update
May 17, 2019 6:26 pm

Project Profile: Oslo’s Fornebu Line (Fornebubanen) Metro Extension

The Fornebu Line is a critical underground metro expansion project in Oslo, Norway, engineered to connect the Majorstuen transit hub with the rapidly developing Fornebu peninsula. This 8.5-kilometer line utilizes advanced tunneling techniques and adds six modern stations to enhance urban mobility, reduce surface-level congestion, and support significant regional economic growth.

Fornebu Line: Project Fact Sheet
AttributeDetails
Project NameFornebu Line (Fornebubanen)
LocationOslo and Bærum, Norway
RouteMajorstuen to Fornebu Senter
Length8.5 km (fully underground)
End-to-End Travel TimeApprox. 12 minutes
Estimated Cost~NOK 16 billion (subject to final budget adjustments)
Project Status (Nov 2025)Under Construction
Key Contractors & ConsultantsMulticonsult, COWI, Arup, Asplan Viak, Zaha Hadid Architects, A-lab

Technical Specifications

The core of the Fornebu Line is an 8.5 km twin-tube tunnel constructed through challenging urban geology, requiring precise drill-and-blast excavation methods to minimize surface disruption. The project includes six new underground stations: Skøyen, Vækerø, Lysaker, Fornebuporten, Flytårnet, and Fornebu Senter. Each station is designed not only for high-capacity passenger flow but also as a distinct architectural landmark, with significant contributions from leading firms like Zaha Hadid Architects and A-lab. Integration with the existing Oslo Metro at the complex Majorstuen junction is a critical engineering challenge. The line is designed for a high frequency of service, with an initial capacity of up to 8,000 passengers per hour per direction, utilizing modern six-car rolling stock.

Key Takeaways

  • Strategic Connectivity: The line provides a high-speed, direct link between Oslo’s central transport network and the Fornebu peninsula, a major hub for business and residential development, drastically reducing travel times.
  • Economic Catalyst: By enhancing accessibility, the project is a key enabler for urban development and is projected to support the creation of up to 20,000 jobs, unlocking the economic potential of the region.
  • Sustainable Urban Mobility: The Fornebu Line offers a high-capacity, zero-emission public transport alternative to private vehicles, directly addressing Oslo’s goals for traffic congestion reduction and environmental sustainability.

Frequently Asked Questions (FAQ)

When will the Fornebu Line open?

While the official opening date is subject to construction progress, current timelines project the Fornebu Line will be operational between 2027 and 2029. Passengers should monitor official announcements from the project authorities for the final commissioning date.

Who is building the Fornebu Line?

The Fornebu Line is a collaborative project involving several leading international and Norwegian firms. The engineering and planning phases are led by consultancies including Multiconsult and COWI, with architectural design for the stations managed by renowned firms like Zaha Hadid Architects and A-lab.