Nagpur Metro: 2026 Construction Update & Route Map
Nagpur’s new metro rail project is complete, easing traffic and pollution. This Railway Sector News update highlights its success and technological advancements.

Nagpur Metro Rail Project: A Technical Profile
The Nagpur Metro is a state-of-the-art mass rapid transit system engineered to mitigate urban mobility challenges in Nagpur, India. This project profile details the technical specifications, strategic financing, and operational framework of the system, which serves as a critical infrastructure asset for the region. It represents a successful implementation of modern railway technology to foster sustainable urban growth and reduce traffic congestion.
| Attribute | Details |
|---|---|
| Project Name | Nagpur Metro Rail Project |
| Location | Nagpur, Maharashtra, India |
| System Length | 38.215 km (Phase I) |
| Design Speed | 90 km/h |
| Estimated Cost | Approx. ₹8,680 crore (Phase I) |
| Status | Phase I: Fully Operational Phase II: Approved / Under Construction |
| Key Contractors & Stakeholders | Maha Metro (Executing Agency), DMRC (Consultant), Siemens, CRRC Corporation, Afcons Infrastructure, Larsen & Toubro |
Technical Specifications
The Nagpur Metro system operates on a standard gauge (1435 mm) track, primarily on an elevated viaduct structure to minimize land acquisition complexities. The project is divided into two main corridors: the North-South (Orange Line) and the East-West (Aqua Line), which intersect at the Sitaburdi Interchange station. The rolling stock consists of modern, energy-efficient three-car trainsets supplied by CRRC Corporation, designed for high-frequency urban service. The system is governed by a Communications-Based Train Control (CBTC) signaling system, ensuring a high degree of safety, operational efficiency, and short headways between trains. This advanced train control technology, integrated with automated fare collection (AFC) and passenger information systems, provides a seamless and secure transit experience.
Key Takeaways
- Urban Decongestion: The project directly addresses Nagpur’s traffic congestion and pollution by providing a reliable and eco-friendly alternative to private vehicles, which previously dominated the city’s transport landscape.
- Innovative Financial Model: Its funding structure, a balanced mix of central and state government equity (20% each), contributions from local bodies (10%), and external debt (50%), serves as a scalable template for future urban infrastructure projects in India.
- Catalyst for Development: The metro network has spurred transit-oriented development along its corridors, boosting real estate values and creating new economic hubs, fundamentally reshaping Nagpur’s urban geography.
Frequently Asked Questions (FAQ)
When did the Nagpur Metro become operational?
The Nagpur Metro was inaugurated in phases. The first section of the Orange Line became operational for public service on March 8, 2019. The entire 38.2 km network under Phase I was completed and became fully operational thereafter.
Who is building the Nagpur Metro?
The Nagpur Metro project is being executed by the Maharashtra Metro Rail Corporation Limited (Maha Metro), a Special Purpose Vehicle (SPV) jointly owned by the Government of India and the Government of Maharashtra. The Delhi Metro Rail Corporation (DMRC) was initially appointed as the project management consultant.
