Lakelands Station: 2026 Construction Update & Route Map

New Lakelands Railway Station opens in Western Australia, boosting Perth-Mandurah line capacity and regional connectivity. The multi-modal hub improves transport and stimulates economic growth.

Lakelands Station: 2026 Construction Update & Route Map
July 15, 2021 5:27 am

Lakelands Railway Station: Project Profile

The Lakelands Railway Station project represents a strategic enhancement to Western Australia’s Mandurah Line, establishing a critical multi-modal transport hub to service Perth’s rapidly growing southern suburbs. This profile details the station’s technical specifications, strategic impact, and key delivery partners. It serves as a benchmark for integrated public transport infrastructure designed to support urban growth and alleviate regional traffic congestion.

AttributeDetails
Project NameLakelands Railway Station
LocationLakelands, Western Australia (approx. 6.5km north of Mandurah Station)
Line/RoutePerth to Mandurah Line
Project TypeNew Station Construction / Integrated Multi-modal Hub
Estimated CostA$80 million
StatusOperational (Opened June 2023)
Key Contractors & StakeholdersMETRONET (Client), ADCO Constructions (Main Contractor), DesignInc (Architect), Hatch RobertsDay (Planning)

Technical Specifications

The station’s design features two below-grade platforms situated within the existing rail corridor, accessed via an elevated central concourse. This configuration ensures minimal disruption to mainline operations and enhances passenger safety. Vertical access is facilitated by stairs and high-capacity elevators, with structural provisions for future installation of escalators to accommodate projected passenger growth. The main station building is bifurcated into public-facing facilities and secure service areas, linked by a spacious circulation zone for efficient passenger flow.

Security and safety systems are integrated based on Crime Prevention Through Environmental Design (CPTED) principles. This includes comprehensive CCTV surveillance, robust mesh fencing, and strategic lighting to maximize visibility. Technologically, the station is equipped with automated ticketing and real-time passenger information systems. The infrastructure is future-proofed with conduits and space for next-generation systems, such as contactless payment gates and enhanced digital displays.

Key Takeaways

  • Integrated Multi-modal Connectivity: The station is a model for seamless transport integration, featuring an 8-bay bus interchange, 400 park-and-ride bays, and dedicated kiss-and-ride and bicycle parking facilities to reduce reliance on private vehicles.
  • Economic and Community Catalyst: The A$80 million investment generated over 200 jobs during construction and now provides crucial transport links for the growing communities of Lakelands, Madora Bay, and Meadow Springs, improving access to employment in Perth’s CBD.
  • Benchmark for Sustainable Infrastructure: Incorporating energy-efficient lighting, sustainable building materials, and a design that promotes public transport use, the project sets a new standard for environmentally conscious rail development in Australia.

Frequently Asked Questions (FAQ)

When did the Lakelands Railway Station open?

The Lakelands Railway Station officially opened to the public on Sunday, 11 June 2023. It became the newest station on the Mandurah Line, providing essential public transport services to Perth’s southern corridor.

Who was responsible for building the Lakelands Railway Station?

The project was delivered by METRONET, a Western Australian Government agency, as a joint initiative with the Australian Federal Government. The primary construction contract was awarded to ADCO Constructions, with key design and planning contributions from firms including DesignInc and Hatch RobertsDay.