North Bengal-Sikkim Railway: 2026 Update & Route
North Bengal-Sikkim railway link progresses, boosting connectivity and national security in the region. This ambitious project overcomes challenging terrain, improving trade and military access.

Project Profile: Sevoke-Rangpo Railway Line (Sikkim Link)
The Sevoke-Rangpo Railway Line is a landmark infrastructure project by Indian Railways, engineered to provide all-weather, broad-gauge connectivity to the state of Sikkim. This strategic line traverses the complex geology of the lesser Himalayas, demanding advanced tunneling and bridge construction techniques to establish a critical economic and military logistics corridor.
| Attribute | Details |
|---|---|
| Project Name | Sevoke-Rangpo New Broad Gauge Railway Line |
| Route | Sevoke (West Bengal) to Rangpo (Sikkim) |
| Total Length (Phase 1) | 44.98 km |
| Designed Speed | 110 km/h |
| Estimated Cost | Over ₹4,000 Crore (Initial Estimate) |
| Status (Nov 2025) | Under Advanced Construction |
| Key Contractors & Consultants | IRCON International (EPC), Amberg Engineering (Design), AECOM (Supervision) |
Technical Specifications
The alignment of the Sevoke-Rangpo line is an extraordinary feat of civil engineering, with approximately 85% of its 44.98 km length consisting of tunnels. The route navigates the challenging terrain of the Kanchanjungha mountain range and the Teesta River valley, requiring precise execution to maintain stability and safety. The line will feature five stations: Raing, Gielkhola, Teista Bazaar, Melli, and the terminus at Rangpo.
The project scope includes 14 primary tunnels, the longest of which spans over 5 km. Construction utilizes the New Austrian Tunnelling Method (NATM) to address the variable and fragile rock strata of the Himalayan geology. These tunnels are equipped with modern ventilation and safety systems, designed to meet the highest international standards for rail transport in mountainous regions.
In addition to tunneling, the project involves the construction of 13 major bridges and numerous minor viaducts to cross the deep gorges and tributaries of the Teesta River. These structures are designed with deep pile foundations and seismic arrestors to withstand the region’s high seismic activity and challenging soil conditions, ensuring the line’s long-term operational resilience.
Key Takeaways
- Strategic Military Logistics: Provides a reliable, all-weather alternative to the vulnerable NH-10 road, significantly enhancing the Indian Army’s logistical capabilities and troop deployment along the India-China border.
- Economic Integration: Set to catalyze economic growth in Sikkim by boosting tourism, facilitating easier transport of goods, and supporting the state’s burgeoning pharmaceutical and organic farming industries.
- Engineering Benchmark: Establishes a new precedent for constructing complex railway infrastructure in the ecologically sensitive and geologically unstable Himalayan region, serving as a model for future high-altitude projects.
Frequently Asked Questions
When will the Sevoke-Rangpo railway line open?
While initial deadlines were revised due to geological challenges and construction complexities, the project is in an advanced stage. As of late 2025, officials indicate a targeted completion and commissioning by late 2026 or early 2027, subject to final testing and safety certifications.
Who is building the Sikkim railway link?
The primary construction and execution agency for the Sikkim railway link is Indian Railway Construction International Limited (IRCON), a specialized public sector enterprise under the Ministry of Railways. IRCON is supported by leading international consultancy firms, including Amberg Engineering for tunnel and bridge design and AECOM for project supervision and 3D monitoring.
