Vancouver’s Evergreen Line, a 11km SkyTrain extension, opened in 2016, boosting northeast Metro Vancouver transit and reducing road congestion.

Evergreen Line Rail Project: Vancouver, BC, Canada
July 12, 2022 11:48 am




Evergreen Line Rail Project, Vancouver – Railway Technology

Evergreen Line Rail Project, Vancouver – Railway Technology

This article explores the Evergreen Line rapid transit project in Vancouver, British Columbia, a significant undertaking designed to alleviate traffic congestion and enhance public transportation in the northeast sector of the Metro Vancouver area. The project’s aims extended beyond simply constructing a new rail line; it sought to integrate seamlessly with existing transit systems, improve regional connectivity, and significantly reduce reliance on private vehicles. This involved meticulous planning, complex engineering solutions, and extensive collaboration among various government bodies, private contractors, and community stakeholders. The analysis will delve into the project’s planning and execution phases, its technological advancements, the financial aspects of the venture, and ultimately, evaluate its success in meeting its stated goals in terms of ridership, traffic reduction, and environmental impact. The discussion will also highlight some of the challenges encountered during the project’s lifespan, and provide insights into the broader implications of such large-scale infrastructure projects for urban development.

Project Overview and Planning

The Evergreen Line, a 11km extension of the Vancouver SkyTrain system (a rapid transit system utilizing automated light rail vehicles), connects Lougheed Town Centre to Douglas College Station. Initially conceived in 2002 following the completion of the Millennium Line, the project faced several delays primarily due to funding challenges. Construction finally commenced in mid-2012 and concluded in December 2016. The line features a mix of elevated, at-grade, and tunneled sections, necessitating a diverse approach to construction techniques. This innovative design, incorporating elevated guideways, a 2km bored tunnel near Como Lake Avenue, and at-grade sections, reflects the challenges of navigating existing infrastructure and varied terrain.

Construction and Engineering

The Evergreen Line’s construction was a complex undertaking involving several key phases. Advanced works, including utility relocation and road widening, were crucial for enabling main construction. The project employed two Tunnel Boring Machines (TBMs) for the tunnel excavation and utilized a combination of pre-cast and cast-in-place concrete for the guideway construction. The elevated sections, comprising approximately 50% of the alignment, utilized a concrete horizontal guideway beam supported by columns. The project also involved the upgrade of a maintenance facility at Edmonds Station to accommodate the new light rail vehicles.

The integration of the Evergreen Line with the existing SkyTrain network required careful consideration of signaling and control systems. The use of Automatic Train Control (ATC) ensured seamless operation and compatibility with the existing infrastructure. Crime Prevention Through Environmental Design (CPTED) principles were also incorporated into the design of the seven new stations to enhance passenger safety and security.

Technology and Rolling Stock

The Evergreen Line utilizes Bombardier Transportation’s Mark I (MkI) and Mark II (MkII) SkyTrain vehicles. The MkI vehicles offer a seating capacity of 41 and a total passenger capacity of 130, while the MkII vehicles, with wider aisles to accommodate wheelchairs and bicycles, have a seating capacity of 33 and a total passenger capacity of 145. The MkII trains boast advanced features such as LED passenger information maps and integrated video surveillance systems, enhancing both passenger convenience and security.

The line operates on a standard gauge of 1,435mm and achieves a maximum operational speed of 80 km/h. The integration of advanced signaling and train control systems ensured high-frequency service, with trains running every 3 to 5 minutes during peak hours. This high frequency, along with the line’s strategic integration with the existing SkyTrain network at Lougheed Town Centre, was essential for optimizing passenger flow and accessibility.

Financial Aspects and Project Delivery

The Evergreen Line project had a total estimated cost of C$1.43 billion. Funding was secured through a partnership between various levels of government and private sector participation. The project was delivered using a Design-Build-Finance (DBF) model, with a competitive tender process involving several major construction companies. SNC-Lavalin’s EGRT Construction consortium was ultimately awarded the main contract for design, construction, and financing.

Project ParameterValue
Project Length11 km
Project BudgetC$1.43 Billion
Project TypeRapid Transit Line Extension (SkyTrain)
Connection of CitiesCoquitlam, Port Moody, Burnaby
Number of Stations7
Construction Start DateMid-2012
Completion DateDecember 2016
Employment Generated (Construction Phase)8,000

Conclusions

The Evergreen Line project represents a significant achievement in expanding Vancouver’s rapid transit network. While initial delays stemmed from funding challenges, the project’s ultimate success demonstrates the feasibility of large-scale public transit projects when collaborative partnerships and effective project management are employed. The integration of diverse engineering solutions—elevated guideways, bored tunnels, and at-grade sections—highlights the adaptability required in navigating complex urban environments. The use of DBF contracting streamlined the project delivery, mitigating risk for the public sector. The project’s success in meeting its ridership targets and reducing road congestion underscores the substantial positive impact of efficient public transit on urban mobility and the environment. Furthermore, the incorporation of advanced technologies, such as ATC and modern rolling stock featuring enhanced passenger amenities, reflects a commitment to delivering a high-quality and user-friendly transit experience. The project’s long-term sustainability is also demonstrable through its environmental impact, helping reduce greenhouse gas emissions. However, future transit planning should account for potential capacity constraints and adapt to evolving technological advancements and changing urban needs. The Evergreen Line’s completion marks a significant step towards a more sustainable and connected future for the Greater Vancouver region.

Company Information

Bombardier Transportation: A global leader in rail technology, providing rolling stock and related systems.

SNC-Lavalin: A global engineering and construction firm involved in various infrastructure projects.

TransLink: The regional transportation authority for Metro Vancouver.

Kiewit and Flatiron: Major construction firms with experience in large-scale infrastructure projects.

Pedre Contractors and BEL Contracting: Smaller construction firms involved in specific aspects of the Evergreen Line project.