Colombo LRT: 2026 Construction Update & Route Map
Sri Lanka’s Colombo LRT project, funded partly by JICA, is underway. The 15.8km Phase 1 rail line will alleviate traffic congestion in Colombo.

Project Profile: Colombo Light Rail Transit (LRT)
The Colombo Light Rail Transit (LRT) is a state-sponsored infrastructure initiative designed to introduce a modern mass rapid transit system to Sri Lanka’s congested capital. This multi-phase project aims to deploy an elevated, standard-gauge rail network, beginning with a 15.8 km corridor, to enhance urban mobility and support the economic development of the Western Megapolis region.
| Attribute | Details |
|---|---|
| Project Name | Colombo Light Rail Transit (LRT) |
| Location | Colombo, Sri Lanka |
| Status (Phase 1) | Under Construction |
| Length (Phase 1) | 15.8 km (elevated) |
| Max Speed | 80 km/h |
| Estimated Cost (Phase 1) | $2.2 Billion USD |
| Key Stakeholders | Ministry of Megapolis and Western Development (MMWD), Japan International Cooperation Agency (JICA) |
Technical Specifications
The Colombo LRT is engineered as an elevated system, with the main line constructed on viaducts approximately 6 meters above ground to minimize surface-level disruption. The initial phase will connect Colombo Fort to Malabe via 16 strategically located stations. The system will operate on a 1,435 mm standard gauge track, powered by a 750V DC third rail electrification system, a common standard for modern urban metros ensuring high efficiency and reliability. The rolling stock consists of four-car trainsets, each designed to accommodate up to 800 passengers. These trains are equipped with rooftop air conditioning, onboard digital displays, and comprehensive surveillance systems to meet modern passenger comfort and safety standards. Station platforms are designed to be 120 meters in length to accommodate the train formations and anticipated passenger flow.
Key Takeaways
- Strategic Decongestion: The project directly addresses chronic traffic congestion in Sri Lanka’s primary economic corridor, aiming to reduce reliance on private vehicles and decrease transit times significantly.
- International Partnership Model: With $1.8 billion in financing from JICA, the project exemplifies a successful public-private and international collaboration model for large-scale infrastructure development in the region.
- Sustainable Urban Development: The LRT system provides an environmentally friendly transportation alternative, contributing to reduced greenhouse gas emissions and aligning with global sustainability goals while incorporating socially inclusive features.
Frequently Asked Questions (FAQ)
When will the Colombo Light Rail open?
The first phase of the Colombo Light Rail Transit project, connecting Colombo Fort to Malabe, is currently under construction. An official opening date has not been finalized and is subject to project milestones and announcements from the Ministry of Megapolis and Western Development. Timelines for the subsequent six phases have not yet been released.
Who is building the Colombo LRT?
The Colombo LRT project is being developed by the Government of Sri Lanka under the authority of the Ministry of Megapolis and Western Development (MMWD). The Japan International Cooperation Agency (JICA) is a key partner, providing the majority of the project’s financing through a Special Terms for Economic Partnership (STEP) loan, in addition to supplying critical technical assistance for its implementation.


